Engineering

DISCLAIMER: The Electricity Company of Ghana Limited (ECG) wishes to inform the general public that our attention has been drawn to an announcement circulating on social media claiming that ECG is recruiting to enhance its workforce. +++ We wish to state categorically that this announcement is false and should be ignored. +++ The general public is to note that, when such announcement is officially made, it will be advertised in print media, on radio and television and can be verified on the ECG Website (www.ecggh.com) and our social media handles. +++

Director/Engineering

 

Ing. Kwadwo Ayensu Obeng

He joined ECG in October 1992 as an Assistant Electrical Engineer. He rose through the ranks to the position of General Manager/System Planning; a position he held until his appointment as Ag. Director Engineering in May 2015. He is the Project Manager for the Ghana Energy Development and Access Programme (GEDAP) which is funded by the World Bank.

As Ag.Director/Engineering, he leads a capable team of electrical engineers in the planning and design of the ECG electrical infrastructure. He is also in charge of Research and Development (R&D) unit of the Company. Furthermore, he is responsible for the master plan of ECG to meet the growing demand and ensuring quality of power supply.

Mr. Obeng holds a B.Sc. Electrical/Electronic Engineering from KNUST and currently he pursuing  his MBA at Coventry University/UK. Kwadwo Ayenso Obeng  is a Corporate member of Ghana Institution of Engineering.

staffmisconduct2.jpg

Careers

 

Connect With Us

Head Office
Electro Volta House
P.O. Box 521, Accra
Tel: +233 (0)302 676727-47
Fax: +233 (0)302 666262
Call Center: +233 (0)302 611611
Email: ecgho@ecggh.com

Social Media