The Electricity Company of Ghana's attention has been drawn to a false alarm circulating on social media, to the effect that, some devices have been installed on ECG poles and are meant to freeze the easy flow of cellphone network during the election period. +++ +++ The ECG wishes to state categorically that this information is FALSE. +++ +++ The communication devices installed on the ECG poles in areas such as; Dodowa, Roman Ridge, Legon, Prampram etc. are meant purposely to facilitate smooth flow of communication between the prepaid meters (NURI prepaid meters) on the field and our server. +++ +++ The general public is therefore being advised to ignore this false alarm. +++ Thank you.

COMPLETED PROJECTS (2012-DATE) OVERVIEW

Click on the links below for details

Distribution Projects

Item No. Project Description No. of Installed Transformers Contractor Contract Sum Year of Completion Expected Impact/Impact
 GH¢
  33/11kV OHL/Underground Circuits          
             
  ACCRA EAST          
1 Extension of supply to Apirede - Akuapem Mampong(Phase II) 2no. 100KVA Glatricks Engineering Limited        30,825.92 2015 New customers were connected to supply thereby improving revenue generation
2 Extension of supply to parts of Wedokum - Dodowa 5no. 50KVA Naflin Consult Limited        55,699.92 2015
3 System Improvement at Dome New Site 4no. 100KVA Mercury Mars Electrical Works        56,456.81 2015 Improved reliability of power supply and customer satisfaction
4 Relocation of the R11 & R02 feeders to pave way for the Ridge hospital upgrade works   Foreen Electrical Eng. Services Limited        67,255.53 2015  
5 Re-insulation and re-conductoring of 11kV OHL at Burma Camp   Majestic Ventures Ltd.        54,628.10 2015 Customer end volatege profile was improved and hence improvement in supply quality
6 Conversion of the existing LV underground network to Overhead using Aerial Bundled Conductors at Okaishie Market   Erns Developers Limited        72,317.40 2014 Customer end volatege profile was improved and hence improvement in supply quality
7 Extension of supply to New Katamanso 6no. 200KVA V.V.S. Company Limited        68,858.06 2014 New customers were connected to supply thereby improving revenue generation
8 Extension of supply to Tsuruman Hills 2no. 200KVA Djeivic Ltd.        33,216.32 2014
9 Re-insulation and re-enforcement of 11kV OHL at Pantang feeder   Hawks Electrical Works Ltd.        48,499.57 2014 Improved reliability of power supply and customer satisfaction
10 System Improvement at Adumanya 1no. 100KVA Dadkenson Company Ltd.        21,374.34 2014 Improved reliability of power supply and customer satisfaction
11 Injection of 2No. 200kVA PMTs at Bakana Hostel Area - West Legon 2no. 200KVA Royal Sentry Company Ltd.        33,948.10 2013 Customer end volatege profile was improved and hence improvement in supply quality
12 Injection of 2No. 200kVA PMTs at American International School Area - East Legon 2no. 200KVA Electromax Engineering        28,255.60 2013
13 Injection of 14No. 50kVA PMTs at Adukrom - Akwapim Mampong 14no. 50KVA Jewalk Company Ltd        91,063.76 2013
14 Injection of 4No. 50kVA PMTs at Awukugua - Akwapim Mampong 4no. 50KVA Maxplan Ventures        52,330.01 2013
15 Extension of supply to some residents at Bethel Prayer Camp - Kwabenya 2no. 100KVA Julie & Ham Enterprise        28,545.49 2013 New customers were connected to supply thereby improving revenue generation
16 Injection of 8No. 50kVA PMTs at Apirede - Akwapim Mampong 8no. 50KVA Glatricks Company Ltd.        44,565.69 2013  
17 Injection of 3No. 50kVA PMTs at Abiriw - Akwapim Mampong 3no. 50KVA Sanoel Limited        33,328.38 2013  
18 Extension of supply to some residents at Oyibi Onukpaah Ebu - Dodowa 2no. 100KVA Jacob Engineering        35,613.27 2013 New customers were connected to supply thereby improving revenue generation
19 Injection of 15No. 50kVA PMTs at Nmaidjon 15no. 50kVA & 3no. 100KVA Lenz Electricals        65,789.85 2016 New customers were connected to supply thereby improving revenue generation
20 Extension of supply to Adoteiman Township 4no. 100KVA Sharp May        68,356.92 2016 New customers were connected to supply thereby improving revenue generation
            856,782.27    
             
  ACCRA WEST          
1 System Improvement and Expansion at Kwesi Nyarko 1no. 100KVA Faz Plax        50,888.15 2015  
2 Extension of supply to Ayawaso China Town 5no 100KVA 2015  
3 Injection at Akortia Mayera 2no. 100KVA Mohaminu Company Ltd.        48,140.24 2015 New customers were connected to supply thereby improving revenue generation
4 System Improvement and Expansion at Pokuase near ACP 2no. 100KVA 2015
5 Extension of supply to parts of Papase 1no. 100KVA Otason Engineering Services        45,088.42 2015
6 Development of electricity supply at parts of Ashikope 1no. 100KVA 2015
7 Rehabilitation of the electricity distribution network at Amamoley 2no. 100KVA Electrical Solutions Limited        52,431.35 2015 Customer end volatege profile was improved and hence improvement in supply quality
8 Rehabilitation of the electricity distribution network at Macedonia Phase I 2no. 100KVA 2015 New customers were connected to supply thereby improving revenue generation
9 Extension of supply to parts of Medie Hill Side 2no. 100KVA Aglawu Company Limited        39,406.07 2015 New customers were connected to supply thereby improving revenue generation
10 Development of electricity supply at Adjen Kotoku(Western Part) 2no. 100KVA     2014  
11 System Improvement at Medie Korley 3no. 100KVA Electrical Solutions Limited        52,431.35 2015 Customer end volatege profile was improved and hence improvement in supply quality
12 System Improvement at Chinto 2no. 100KVA Santa Engineering        29,382.88 2014  
13 Rehabilitation of LV Network at Gbawe Gonse 5no 100KVA America West Ghana Ltd.        37,794.33 2014  
14 LV Network upgrade at Abloman 2no. 100KVA Miquart Company Limited        44,949.32 2014  
15 Extension of supply to Pokuase Odumase 1no. 100KVA Rich-Glow Company Limited        27,744.43 2014 New customers were connected to supply thereby improving revenue generation
16 LV System Improvement at Dansoman Exhibition 5no. 315KVA GMT Bengasco Ventures        28,940.36 2014
17 Extension of supply to Adjen Kotoku 1no. 100KVA Atlas Engineering        26,950.04 2013
18 Extension of supply to Oshiyie 1no. 100KVA Kenco Limited        30,848.80 2013
19 Improvement and Extension of supply to
parts of Adjin Kotoku
1no. 100KVA Technolights        62,530.50 2016
20 Extension of supply to part of  Obeyie 6no. 100KVA Otason Engineering Services        79,713.99 2016
21 Extension and improvement of supply to Nsawam Ntoaso 3no. 100KVA Gyambis        26,248.00 2016
22 Extension of supply to part of Ayikai Doblo 7no. 100KVA Sofeq Contract Works        78,361.68 2016
23 Extension of supply to parts of Pokuase Dunyo 5no. 100KVA Arbecomb Ltd      117,949.11 2016
24 Extension of supply to parts of Pokuase Odumase 4no. 100KVA Arbecomb Ltd 2016
25 Extension of supply to parts of Ablomanm New York Cty 2no. 100KVA Pink Electrical        49,587.43 2016
26 Extension of supply to parts of Obeyie Phase II 6no. 100KVA Samjowa Ltd      200,806.50 2016
27 Extension of supply to part of Hebron 4no. 100KVA Samjowa Ltd 2016
28 Extension of supply to parts of Ankwa Doblo 2no. 100KVA Samjowa Ltd 2016
29 Extension of supply to parts of Pokuase DA school 2no. 100KVA XF Engineering      183,170.43 2016
30 Extension of supply to parts of Ayawaso China Town 5no. 100KVA XF Engineering 2016
31 Extension of supply to Yaw Bouwi 1no. 100KVA Icon World        31,769.72 2016
32 Extension of supply to Ahodwo 2no. 100KVA Luke & Sons        46,522.72 2016
          1,391,655.82    
             
  TEMA          
1 Linking of feeder L21 to Buade feeder from Batsonaa Primary Substation   Joe & Sam Electrical Engineering Company Limited        71,083.55 2015 Improved reliability of power supply and customer satisfaction
2 Upgrade of LV network at Dawhenya Tabora 3no. 100KVA New Ideas Electrical Works        38,762.14 2015
3 Extension of supply to Katamanso Ashaiman 2no. 100KVA Djeivic Limited        23,884.22 2015
5 System Improvement at Adwemador (Phase II) 2no. 100KVA Luke & Sons Company Limited        30,446.57 2015
6 Rehabilitation of the electricity distribution network at Nungua & Sakumono - Lot D 3no. 100KVA Chris Power Eng.        78,892.70 2014
7 Extension of supply to Manya Krobo Secondary School 2no. 100KVA Three Dots Company Limited        24,565.38 2014 New customers were connected to supply thereby improving revenue generation
8 Extension of supply to Agavenya Gbekorman - Somanya 2no. 100KVA 2014
9 Rehabilitation of the Kpone Garages Overhead line & the creation of a third 11kV line from the Olam Substation   Chris Power Eng.        59,051.61 2014 To reduce network downtime, technical losses and supply reliability
10 Low Voltage Improvement in Ashaiman New Town 3no. 100KVA S.B. Dynamics        56,300.04 2014 Customer end volatege profile was improved and hence improvement in supply quality
11 System Improvement at Dawhenya Abbey Kope 2no. 100KVA Come Enterprise        24,902.83 2013 To reduce network downtime, technical losses and supply reliability
12 System Improvement at Dawhenya A.R.S. 4no. 100KVA Ponyan Electrical Eng.        88,225.12 2013  
             496,114.16    
             
  ASHANTI EAST          
1 Development of electricity supply at Apaah 6no. 100KVA Renowned Electrical Contractors Ltd.      116,458.80 2015 New customers were connected to supply thereby improving revenue generation
2 System Improvement at Kona Zongo 1no. 100KVA Saviour Power        41,217.00 2014 Improved reliability of power supply and customer satisfaction
3 System Improvement at Tano Odumase 1no. 100KVA 2014
4 Development of electricity supply at Pankrono Estate 1no. 100KVA Archives Enterprise        24,214.12 2014
5 Extension of supply to Noble Price School 1no. 100KVA 2014 New customers were connected to supply thereby improving revenue generation
6 Extension of supply to Market & MTN Site 1no. 100KVA 2014
7 RSIP works at Bipoa 1no. 100KVA Okoso & Sons Electrical Company Ltd.        30,568.59 2015 Improved reliability of power supply and customer satisfaction
8 RSIP works at Kyerefaso 2no. 100KVA 2014
9 System Improvement at Kona Town 1no. 100KVA Unto Abraham Company Limite        36,811.37 2014
10 System Improvement at Bepoase 1no. 100KVA 2014
11 Extension of supply to Adeeho 1no. 50KVA Kwodam Electricals        18,009.39 2014 New customers were connected to supply thereby improving revenue generation
12 System Improvement at Konongo Freetown & Ahyayem 2no. 100KVA Unto Abraham Company Limited        27,512.22 2013 To reduce network downtime, technical losses and supply reliability
13 Extension of supply to Beposo 2no. 100KVA Paulman Trading Limited        33,339.77 2013 New customers were connected to supply thereby improving revenue generation
14 System Improvement at Wiamoase(sheet IV) 1no. 50KVA Thuffos Company Ltd.        19,022.53 2013 To reduce network downtime, technical losses and supply reliability
15 System Improvement at Atonsu Gyenim 1no. 50KVA 2013
16 Rehabilitation of existing supply at Kenyase Brofoyedru 2no. 50KVA Volta Powers        21,163.93 2013 The project has reduce network downtime, technical losses and supply reliability within the Kenyase community
17 System Improvement at Nsuta DCE Bungalow Area - Mampong 2no. 10KVA Ayimens Electricals        25,985.96 2013 Customer end volatege profile was improved and hence improvement in supply quality
            394,303.68    
             
  ASHANTI WEST          
1 Low voltage network improvement project in Abuakwa district 4no. 100KVA Adusi Electrical        93,948.26 2015 The injection works have improved voltage profiles, reduced technical losses and provided the needed capacity for customer connection
2 Injection of 4No. 50kVA PMTs at Kropo - Suame 4no. 50KVA Mohatu Electrical Eng. Limited        24,217.94 2015 The injection works have improved voltage profiles, reduced technical losses and provided the needed capacity for customer connection
3 Injection of 3No. 50kVA PMTs at Abrepo Highways 3no. 50KVA 2015
4 Injection of 3No. 50kVA PMTs at Abrepo Town 3no. 50KVA 2015
5 Creation of Switching points at Obuasi   My Friend Electrical Works        49,509.23 2015 Improved operational efficiency
6 Linking of E11 & E51 feeder at KAS Products - Suame   2015 Improved operational flexibility
7 Re-inforcement of faulty cable at Danyame   2015 There has been improvement is system supply reliabiltiy within the Danyame District
8 Low voltage network improvement project at Edwinase,Atwima Takyiman, Atwima Denkyemuoso Freetown, Asuoyeboah,Atwima Boko,Atwima Boko No.2,Atwima Agogo. 16no. 50KVA Adusi Electrical        93,948.26 2015 The injection works have improved voltage profiles, reduced technical losses and provided the needed capacity for customer connection
9 Low voltage network improvement project in Bekwai & Danyame districts 4no 100KVA Komfather Electrical Company Ltd.        92,251.97 2015
10 Development of electricity supply at Apaah - Mampong 2no 100KVA Renowned Electrical Contractors Limited      116,458.80 2015 New customers were connected to supply thereby improving revenue generation
11 Upgrade of LV network at Kyekyewere - Mampong 2no 100KVA 2015 To reduce network downtime, technical losses and supply reliability
12 Additional 11kV Outgoing feeder(Abakomadi) at Abuakwa Primary Substation   Adusi Electricals        33,725.38 2014 Has led to relief od overloaded feeders from the Abuakwa Station and improved system reliability
13 RSIP works within Obuasi District 3no 100KVA Kwanash Enterprise        52,621.46 2014 It is expected that voltage profiles will be improved and hence the quality of supply
14 System Improvement at Jacobu 2no 100KVA My Friend Electrical Works        41,346.13  
            598,027.43    
             
  EASTERN          
1 LV & Primary Distribution Network Improvement Projects in Mpraeso District - Lot B 3no. 100KVA Tower Rock Company Limited      113,725.69 2015 System voltage profiles are expectted to improve with attendant loss reduction
2 Rehabilitation works at Aboabo - Koforidua 3no. 100KVA Royal G. Enterprise Limited        66,579.02 2015 There has been improvement is system supply reliabiltiy within the Aboabo enclave
3 Extension of supply to parts of Suhum 2no. 100KVA 2015 New customers were connected to supply thereby improving revenue generation
4 HT Overhead line upgrade works in Mpraeso district (Akwasiho Junction -  Hweehwee Town)   Jomef Electrical Engineering      101,740.76 2015 Improved system reliability and customer satisfaction
5 Rehabilitation of LV network at Oda Township 5no. 100KVA K.B.A. Engineers Limited      131,732.82 2015 Improved system reliability, customer satisfaction and voltage profiles
6 Extension of supply to Adjeikrom - Begoro 1no. 100KVA 2015
7 System Improvement at Hemang - Begoro 1no. 100KVA 2015
8 Linking of St. Joseph & Estate Junction feeders - Mpraeso District   Kwamens Electricals        35,057.87 2015 Improved system reliability
9 System Improvement at Saamang - Tafo District 2no. 100KVA Murab Ventures        33,843.63 2015 Reduction in technical losses and improvement in customer end volages
10 Injection of 3No.100kVA PMTs,11/0.433kV at New Abipotia 3no. 100KVA Jewalk Company Ltd.        24,932.56 2014 Reduction in system downtime and improvement in customer end voltages
11 Upgrade of existing LV network at Community 6 - Oda 2no. 100KVA Modern Electrical Eng.        30,217.18 2014 Reduction in customer end voltages with the Oda community
12 LV & Primary Distribution Network Improvement Projects in Mpraeso District - Lot A 8no. 100KVA D.K.Afoakwah Enterprise      158,246.12 2014 System improvement works has led to reliability of power supply and reduction in customer end voltages
13 LV & Primary Distribution Network Improvement Projects in Mpraeso District - Lot C 6no. 100KVA Modes Power Services      118,087.68 2014
14 Extension of supply to Osino Canaan 2no. 100KVA Murab Ventures        33,843.63 2013 Has led to connection of new customers thereby improving revenue generation
15 Extension of supply to Mile 50 - Koforidua 2no. 100KVA Santa Clara Electrical Works        34,150.49 2013 Has led to connection of new customers thereby improving revenue generation
16 System Improvement at Koforidua Township 2no. 100KVA Elyon Electrical Engineering        39,233.07 2013 Improved reliability and reduction in customer end voltages
             921,390.52    
             
  VOLTA          
1 System Improvement at Kpando Abanu 3no. 100KVA MFK Electrical Engineering        29,668.80 2015 System voltage profiles are expectted to improve with attendant loss reduction
2 Extension of supply to parts of Akatsi 1no. 100KVA Electro-Dynamic Services        40,546.15 2015 To meet growing demand and improve revenue generation
3 Extension of supply to parts of Ho Kpenoe 2no. 100KVA Lorfan Enterprise        28,416.60 2015 To meet growing demand and improve revenue generation
4 System Improvement at Kpeve 3no. 200KVA Faz Plax        43,699.48 2015 To upgrade undersized conductors & replace substandard poles  to enhance reliability of supply to customers
5 System Improvement at Torve 1no. 50KVA Areco Electricals        18,814.07 2014 To upgrade undersized conductors & replace substandard poles  to enhance reliability of supply to customers
6 System Improvement at Aborlove & Nolopi 1no. 100KVA Areco Electricals        20,137.74 2014 To upgrade undersized conductors & replace substandard poles  to enhance reliability of supply to customers
7 RSIP works at Akpafu Mempeasem 2no. 100KVA Keen Enterprise        26,097.60 2014 System voltage profiles are expected to improve with attendant loss reduction
8 RSIP works at Kpetoe 3no. 100KVA & 1no. 50KVA Ricsah YB Electricals        40,246.93 2014
9 LV Network upgrade at Matse 1no. 100KVA All Tech Engineering        27,158.03 2013 It is expected that voltage profiles will be improved and hence the quality of supply
            274,785.40    
             
  WESTERN          
  Injection of 10No. 100kVA PMTs at Sefwi Bekwai 10no. 100KVA Sultina Limited        37,957.86 2014 The injection works have improved voltage profiles, reduced technical losses and provided the needed capacity for customer connection
  RSIP works at Apowa(Ghacem Estate) 3no. 100KVA Powertech Electrical Engineering Works        30,859.50 2014 Voltage profile has been improved after undersized conductors were upgraded
  Upgrading of LV Network at Egyam 1no. 100KVA Erisam Electrical Construction Ltd.        27,187.52 2013 The project has reduce network loss downtime, technical losses and supply reliability within the Egyam community
  Upgrading of LV Network at Makaros New Site 2no. 100KVA Ohms Electricals        29,141.80 2013 To reduce network loss downtown, technical losses and supply reliability
  Extension of supply to Bonyere 2no. 100KVA Vamba Construction Works        26,411.85 2013 To meet growing demand and improve revenue generation
             151,558.53    
             
             

Major Completed Projects in 2015


 

ITEM NO. PROJECT/CONTRACT DESCRIPTION
1 Re-conductoring and re-insulation of 11kV Networks in forested areas in Ashanti East Region - Lot A
2 Re-conductoring and Re-insulation of 33kV feeders passing through forested areas at Senya Breku in Central region
3 Rehabilitation of networks of selected Markets at Agbogbloshie - Package B
4 Transfomer Injection and System Improvement works within six communities at Achiase, Akim Oda District
5 LV Network upgrade at Abloman
6 Extension of supply to Paapa Fio - Nmai Djor
7 Rehabilitation of LV Network at Oda Township
8 Extension of supply to Adjeikrom - Begoro
9 Linking of St. Joseph & Estate Junction feeders - Mpraeso district
10 Intensification of Supply to Abomosu, Kukubi and Owonomera, New Abirem
11 Transformer injection & intensification works at Akokoaso, Akim Oda
12 Reconductoring and Reinsulation of 11kV Networks in forested Areas, Sekondi and Takoradi Districts
13 Supply and installation of Covered Conductors at Agona in the Western Region
14 Re-insulation of Bawjaise 33kV Feeder - Central Region
15 Reconductoring and Reinsulation of 11kV Networks in forested Areas, Ashanti East Region LotB
16 Low Voltage Network Improvement Project in Mampong District - Bipoa,Beposo & Agona Zongo
17 Extension of supply to Kaipone near Abbey Kope & Adotey near Dawood Company Limited
18 Rehabilitation of LV network at Kpone Lagoon area
19 System Improvement at Dawhenya Kaipone
20 Upgrade of LV network at Dawhenya Tabora
21 Extension of supply to Katamanso Ashaiman
22 Linking of feeder L21 to Buade feeder from Batsonaa Primary Substation
23 System Improvement at Adwemador (Phase II)
24 Extension of supply to parts of Akatsi
25 Extension of supply to parts of Ho Kpenoe
26 System Improvement at Kpeve
27 Construction of two separate 11kV underground circuits from the Tokuse substation to the proposed West Hills Shopping Mall project at Bortianor
28 Reconstruction of the Nkawkaw Bulk Supply Point
29 Construction of 11kV and 33kV offloading circuits at Nkawkaw BSP
30 Laying of 2x3(1x630sq.mm) XLPE 33kV Al cables from James Town to the 33/11kV substation G and 33/11kV Ministry Substation
31 Construction of 2x60MVA 33kV overhead circuit from Mallam BSP to New Dansoman S/S.
32 Creation of 11kV off-loading circuits from the Darkuman Primary Substation
33 Relocation of Existing 11kV Underground Cables at Cape Coast BSP
34 System Improvement at Medie Korley
35 Extension of supply to parts of Medie Hill Side
36 System Improvement at Dome New Site
37 Extension of supply to parts of Wedokum - Dodowa
38 Extension of supply to Apirede - Akuapem Mampong(Phase II)
39 RSIP at Gomoa Pomadze
40 RSIP at Winneba(AAC)
41 RSIP at Yamoransa
42 RSIP at Fetteh Kakraba
43 RSIP at Winneba(ABC)
44 RSIP at Agona Nsaba
45 System Improvement at Aboabo-Koforidua
46 System Improvement at Suhum Township
47 System Improvement at Saamang - Tafo District
48 Injection of 3No.50kVA PMTs at Abrepo Highways
49 Injection of 3No.50kVA PMTs at Abrepo Town
50

Low voltage network improvement project in Bekwai & Danyame districts

51

Low voltage network improvement project in Abuakwa district

52

Low voltage network improvement project at Edwinase,Atwima Takyiman, Atwima Denkyemuoso Freetown, Asuoyeboah,Atwima Boko,Atwima Boko No.2,Atwima Agogo.

53 Development of electricity supply at Apaah - Mampong
54 System Improvement at Yonso

 

 

 

 

NPD COMPLETED PROJECTS (2012-DATE) OVERVIEW

ITEM NO. PROJECT CATEGORY Greater Accra / Tema Region Ashanti Region Eastern Region Central Region  Western Region Volta Region Total  Completed LOCATION (of Work Completed)
[No./Length (km)/Qty]  
1 New 33/11kV Primary Substation 12   2 2 2   13 Accra/Tema: LA(Trade-Fair); Adabraka; Darkuman; Gbawe; Aburi; Shiashie; Awudome; Osu; Nungua; Accra Lotteries;  Tema TTL; ECG Training School                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Ashanti :                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Eastern : Koforidua Mile 50; Akim Oda                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Central : Elmina; Swedru                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Western :Takoradi Freezones; Takoradi "D"
2 33/11kV Primary Substation Rehabilitation Projects 8   2   1   5 Accra/Tema: Tema S/S "A", "D"," E"; Achimota BSP; Kokomlemle (F); Burma Camp (L); Makola (G); North Kaneshie (D)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Ashanti :                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Eastern : Nkawkaw and Old Koforidua S/S                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Central :                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Western :Abosso
3 33/11kV Primary Substation Upgrade Projects 3 3 2 1 3   11 Accra/Tema: Akuampim Mampong; Odorkor; Nsawam                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Ashanti : Ejisu (Akyeakrom); Effiduase; Abuakwa                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Eastern : Tafo BSP and Bunso Akwatia                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Central : Winneba                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Western : Akyempim and Daamang
4 33/11kV Switching Station 2 1 2   2   1 Accra/Tema: Dodowa,Kasoa                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Ashanti : Ejisu (Akyeakrom)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Eastern : Suhum and Bunso Junction                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Western : Akyempim and Daamang
5 Bulk Supply Points (BSP's) 1           1 Trassaco (Adjiringano)
6 Primary SCADA 4           4 La, Akuse, Sowutoum, Cantoments and Kwabenya, Accra & Tema Control Centres.
7 Secondary SCADA             220 A total of 220No. Secondary SCADA connection points in over 10 Districts in the Ashanti and Western Regions under Secondary Automation Project Phase 3&4
8 33/11kV Underground Cables 140 20 10 15 20 10 215km The total of 215km of Underground Network have been constructed at various portions of the Network across ECG Operational Regions
9 33/11kV Overhead Lines 375 200 160 96 63 48 950km The total of 942km of Overhead Line Network constructed at various portions of the Network across ECG Operational Regions
  a.60MVA Double Circuit Overhead Lines 36           36km Tema "H" to Ashiaman; Tema "H" to Tema "A"
  b.40MVA  Double Circuit Overhead Lines 150 60 50 70 60   390km Accra/Tema: Adenta to Dodowa; Nmai Dzor to Adenta; Nsawam to Aburi to Manmpong; Nsawam to Ofankor; Mallam to Dansoman; Lashibi to Teshie Nungua; Mobole to Appolonia; Tema "A" to "D"; Tema "E" to "D"; Tema "A" to Ashiaman;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Ashanti : Ejisu S/S to Kuntunase S/S , Kuntunase to Kaase                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  Eastern : Tafo BSP to Bunso Junction; Old Koforidua S/S to Tafo BSP; Old Koforidua S/S to Koforidua Mile 50 S/S; Akim Oda to Akwatia BSP; Suhum Switching Station to Bunso Junction S/S.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Central :  Elmina to Cape Coast BSP, Kasoa Switching Station to Winneba S/S.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Western :Takoradi "C" to Western Diamond Cement Factory; Takoradi Station "B" to "D"; Takoradi Station "A" to "C"; Takoradi Station "B" to "C"; Takoradi Station "A" to "B"
11 Rural Electrification Projects                
  a. Weldy Lamont             1621 1,621 Communities have benefitted from Grid Extension projects:                                                                                                                                                                                                                                                                                                                                                                                                                         Western: Sefwi, Bia, Juabeso, Amenfi, Bogoso,Asankragua, Tarkwa                                                                                                                                                                                                                                                                                                                                                                                                                     Central: (Cape Coast, Gomoa, Mfantsiman, Asikuma Odobeng Brakwa, Assin North, Twifo Praso Upper Denkyira East and West, KEEA)
  b. SHEP 4 Phase 2 (CWE Phase 2)             96 Ashanti Akim South, Nkwanta South, Kejebi, Jasikan, Hohoe, Ho and Gomoa Districts
  c. CWE Phase 3             780 780 Communtieis across the Ashanti, Central, Eastern, Greater Accra, Volta and Western Regions have benefitted from the electrical network extension projects.
  d Grid Extension in Central Region             85 Cape Coast, Assin North, Mfantsiman, Abura Asebu Kwamankese, Ajumko Enyan Asiam, Asikuma Odobeng Brakwa, Ewutu, Twifo Hemang Lower Denkyira, Gomoa
  e Grid Extension in Western Region             128 Aowin/Suaman, Bia, Bibiani Anwiaso Bekwai, Jomoro, Juaboso, Mpohor Wassa East, Sefwi Wiawso, Amenfi East and West
  f. Grid Extension in Ashanti Region             62 Bekwai, Amansie Central and West, Ahafo Ano South, Asante Akim South, Sekyere East and South.
  g. Grid Extension in Eastern, Greater Accra and Volta             107 Greater Accra: Ga East, Ga West, Dangbe East                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Eastern: Birim Central, Atiwa, Kwahu South, Suhum, Akyemansa, Birim South, West Akim.                                                                                                                                                                                                                                                                                                                                                                                                          Volta: Ho, Adaklu, Akatsi, Ketu South, South Dayi.
  h. Intensification in Western and Central             139 Western ( Sekondi, Mpohor Wassa East, Nzema East, Jomoro, Tarkwa Nsuaem, Wassa Amenfi East and West)
  i Intensification in Ashanti             145 Bekwai, Obuasi, Offinso, Adansi, Amansie West, Atwima Nwabiagya, Bosomtwe, Afigya Kwabre,  Ejisu Juaben, Asante Akim South, Kwabre, Sekyere East, Mampong.
  j. Intensification in Greater Accra, Eastern and Volta             165 Greater Accra: Dangbe East and West, Ga West and Tema.                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Eastern: Akim East, Akuapim North, Akuapim South, Birem North, Birem South, Kwaebibirem, Suhum Kraboa Coaltar, West Akim.                                                                                                                                                                                                                                                                                        Volta : Akatsi, Ho, Hohoe, Jasikan, Ketu, Kpando, Kpeve, North Tongu, South Tongu, Nkwanta.
  SECO Projects       108     108 108 Communties in the Central Region benefitted from 33/11kV Network extensification projects:                                                                                                                                                                                                                                                                                                                                                                        Agona, Gomoa, Ajumako Enyan Asiam, Asikuma Odobeng Brakwa, Mfantsiman, Assin South
  Network Extension Project in Prestea Township         10   10 10 Communities within the Prestea Hunni-Valley  District benefitted from the Construction of a Switching Station and community Power Extension services.
  Utilization of Steel Tubular Pole Contract 7   10       17 Greater Accra: (Oyarifa JB Hills, Mariakrom, Agyanoa 1&2, Dodowa Osudoku, Amokrom, Adukrom, Yaw Dodoo)                                                                                                                                                                                                                                                                                                                                                                   Eastern : ( Besiase Amanfrom, Amoyaw Kwamekrom, Takyikrom, Pepawani, Ottohpayan, Oboadakwa, Kwamentow, Awoyekrom, Adjenbiti) Ashanti Region (Minti)
12 Markets Rehabilitation Projects 2 1         3 Agbogbloshie, Asafo and Mallam-Atta Markets
13 Re-insulation and Re-conductoring of 33/11kV OHL Networks                
a Greater Accra 10km           10km Somanya
b Central Region       511km     511km Senya Breku; Benso-Bobikuma; Swedru; Bawjiase
c Western Region         92km   52km Secondi-Takoradi, Nyanokrom-Aboadze-Abresi, Amafrom, Benso, Apowa
d Tema Region         25km   25km Krobo, Asutuare Vilivo,Comandor
e Ashanti East Region   110km         110km Mampong, Nsuta, Konongo, Effisduase, Agogo, Tech, Ayeduase
14 Electrical Relocation Projects             14 14 Electrical Relocation works completed on the following:                                                                                                                                                                                                                                                                                                                                                                                                                                                     Circle Interchange, Agona to Elubo, Tarkwa-Bogoso-Ayanfuri, Ayanfuri to Asawainso, Tetteh Quarshie to Mallam, Dansoman High Street, Ayanfuri to Asawinso Lot 2, Madina Boundary Road Lot 1, Giffard Road Lot 1, Giffard Road Lot 2, Giffard Road Lot 3, Construction of Bus Rapid Transport lanes at Tesano, Construction of Bus Rapid Transport Terminal at Tesano, Agona Junction to Elubo 
15 ML/LV Improvement Works                
a RSIP/LVNIP Projects 281 135 84 137 60 27 724 About 724No. Distribution Transformers installed across various Districts, Towns and Villages across ECG Operational areas
b District Capital Network Electrification Project 3 4 4 2 6 15 34 34 out of 39 District Capitals have benefitted from Network Intensification and Extensification Projects                                                                                                                                                                                                                                                                                                                                                                           Greater Accra: Kpone; Prampram; Sege           Ashanti: Asokore Mampong; Drobonso                                                                                                                                                                                                                                                                                                                                                                                       Central: Hemang; Essarkyir                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Western: Manso Amenfi; Mphohor; Bodi; Dadieso                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Eastern : Akwatia; Coaltar; Tease; Nsawam; Adeiso                                                                                                                                                                                                                                                                                                                                                                                                                                                        Volta: Ave Dakpa; Ve Golokwati; Adaklu Waya; Battor Gbogame; Anfoega; Kpando
c CB Electric (Phase 1) in Central and Western Region                
  i. Network Extension works in (30No. Communities) Central Region       30     30 30 Communities in the Cape-Coast District; Twifo Praso; Saltpond' Breman Asikuma and Swedru Districts benefitted with about 40 Distribution Transformers installed
  ii Network Extension works in  56No. Communities in the Western Region  and Network Extension works                                                                                                                                                                                                                                                                                                                                             56     56 56 Communities in the Asankragua, Bogoso, Tarkwa, Asankragua, Sefwi Wiaso and Juabeso Districts with about 100 Distribution Transformers installed.
d CB Electric (Phase 2) in Eastern and Volta Region                
  i. Network Extension works in  Eastern Region (completed extension works in 48No. Communities)     52       52 52No. Communities in the Akim Oda, Nkawkaw, Koforidua, Kibi, Suhum, New Abirem, Atiwa Districts with about 60No. Distribution Transformers installed.
  ii. Network Extension works in 42No. Communities in the Volta Region (completed extension works in 10No. Communities)           10 10 10No. Communties in the Keta, Ho, Hohoe, Kpando, Kpeve, Jasikan/Kadjebi, Nkwanta, Denu Districts 50No. Distribution Transformers installed.
                   
NOTE: Data provided updated as at July, 2016    

On-Going Projects

 

 

IMPROVE CUSTOMER SERVICE DELIVERY
1

Provision of Power Supply to the new Achimota Shopping Mall.

2

Provision of a second dedicated 33kV circuit to Sentuo Steel Ltd. in Tema & a dedicated 11kV circuit to the Tigo head office in Accra.

3 Provision of a dedicated 11kV circuits to SSNIT Emporium & Icon House at Airport City as well as other feeders to support the public network
4

Extension of power supply to switchback park development Project & another to SBC Beverages Ghana Ltd

5

Low Voltage and Primary Distribution Network Improvement Projects of the Ashanti Region- Town Hall, Airport 1, Feeder C21, Feeder C31 Station A GBC and WAHW.

6

Low Voltage Network Improvement Projects in the Manhyia and Asokwa District of Ashanti East Region

7

Low Voltage Network Improvement Projects in Konongo District – Odumasi SSNIT area.

8

Low Voltage Network Improvement Projects in Effiduase District - Asotwe, Woraso, Adan Womase, Bonwire, Abira, Serwaa Akura and Ejisu.

9

System Improvement at Oshiokpo

10

Extension of supply to New Seprepor (Phase II)

11

System Improvement & expansion at Koluedor

12

Extension of supply to Kpone Hanaa opposite Kokompe

13

System Improvement at Mlitsakpo North

14

System Improvement & expansion at Bowiri Anyinase

15

RSIP works at Aflao Teshie

16

Rehabilitation of LV network at Tsikpota

17

Extension of supply to Aboadze – Sekondi

18

Upgrade of LV OHL network at Akoon-Tarkwa

19

Extension of Supply to Sokode Ando

20

Rehabilitation of the Primary Substation at Bekwai

21

Construction of a 25km 2x40MVA Tower line from Kuntunase to Bekwai

22

Construction of 11kV & 33kV Offloading Circuits from the Reconstructed Abosso Primary Substation

23

Construction of a Primary Substation at Tema, along the Meridian road

24

Construction of permanent substation at the existing Kpone Industrial area (OLAM) in Tema

25

Provision of a dedicated 11kv underground circuit to the Kumasi shopping mall facility at Asokwa, Kumasi

26 Karpowership Evacuation Project; Conversion of 11kV Overhead Line to underground around Valco, Tema
27 Separation of the Tetteh Quarshie Hospital from the Mampong Township Feeder

 

IMPROVE OPERATIONAL EFFICIENCY
1

Construction of the La Trade-Fair Primary Substation.

2

Secondary Automation Project Phase III and IV.

3

Creation of 11kV offloading circuits from the proposed Shiashie Primary substation in Accra.

4

Creation of 11kV offloading circuits from the 33/11kV substation at Inchaban waterworks.

5

Creation of three (3) 11kV offloading circuits from the newly constructed Aburi Substation.

6

Creation of 11kV offloading circuits from the lotteries primary substation in Accra

7

Expansion of Primary SCADA (Ghana 2)

8

Expansion of the SCADA Project in Accra and Tema (GH3)

9

Secondary SCADA Automation III & IV

  • Greater Accra Region: Tema, Ada
  • Central Region: Cape-Coast, Winneba and Saltpond.
  • Western Region: Takoradi, Bogoso, Esiama.
  • Eastern: Koforidua, Nkawkaw, Somanya, Dwenase.
  • Volta: Ho, Kpando, Nkwanta.
10

Construction of an Indoor Primary Substation at LA-Trade Fair

11

Construction of 33/11kV 2x20/26MVA Kisseman Indoor Primary Substation

12

Creation of 11kV offloading circuits from the 33/11kV substation at Inchaban waterworks

13

Creation of three (3No.) 11kV offloading circuits from the newly constructed Aburi Substation

14

Supply and Installation of complete SCADA System and Network Upgrade Projects in Central Region

15

Construction of an Indoor Primary Substation at Mataheko, and a Switching Station at Agona Nkwanta

16

Weldy Lamont Project

17

China Water & Electric Corporation (CWE Phase 3)

18 Network Extension and Installation of Customer Services in Tema Region (STONE ELECTRICALS) ECG/SEWL-2014/01
19

Network Extension and Installation of Customer Services in Tema and Accra West Region (STONE ELECTRICALS) ECG/SEWL/USP-2014/02

20

Network Extension and Installation of Customer Services in Accra West Region (RENOWNED ELECTRICALS) ECG/SEL-2014/02

21

Network Extension and Installation of Customer Services in Accra West Region (KOMFATHER ELECTRICALS) ECG/KECL/USP-2014/02

22

Network Extension and Installation of Customer Services in Eastern Region (KOMFATHER ELECTRICALS) ECG/KECL/USP-2014/01

23

Network Extension and Installation of Customer Services in the Accra East Region (BOYKA ENGINEERING) ECG/BEL/USP-2015/01

24

Network Extension and Installation of Customer Services in the Eastern Region (VOLTA POWERS ELECTRICAL) ECG/VPECL/USP – 2015/01

 

REDUCE SYSTEM LOSSES
1

Conversion of the Ejisu (Akyeakrom) 33kV outdoor switching station to a 33/11kV substation.

2

Creation of a new 11kV line from the Nsawam substation to relieve the Nsawam- Accra11kV line.

3

LV network improvement at Nmai Djor in Accra East Region

4

No. On-Going RSIP Projects:

5

Rehabilitation of the electricity distribution network within the Tema Community One (1) Market, Tema South District

6 Rehabilitation of the electricity distribution networks within Takoradi Market Circle

 

IMPROVE SYSTEM RELIABILTY
1

Replacement of Obsolete 33kV I/D switchgear in 6No. Substations in Accra

S/S ‘H’, Achimota BSP

2

Supply only and supply & Installation of 33kV outdoor switchgear and equipment at Effiduase Substation

3

Supply and Installation of additional 33kV Bays at Cape Coast Bulk Supply Point and Construction of New Control Room Building Including SCADA Office

4

Construction of a 25km 2x40MVA 33kV Double Circuit Tower Line from Kumasi “D” to Kuntunase Switching Station

5

Laying of underground cables from ECG’s Airport City substation to connect the proposed Shiashie Substation

6

Laying of 2x3x2(1x630sq.mm) XLPE 33kV Al cables from the 33/11kV substation 'B' at Korle-Bu to James Town

7

Laying of 2x6(1x630sq.mm) XLPE 33kV Al cables from the Proposed Darkuman Substation to Darkuman Official Town Traffic Light

8

Conversion of the Anloga 11kV line to 33kV & linking it to the Adina 33kV line (ECG/ANLOGA-11-CONVERSION/15)

9

Relocation of Existing 11kV Underground Cables at Cape Coast BSP

10

Improvement & extension of supply to parts of Adjen Kotoku

11

Extension of supply to parts of Obeyie

12

Low Voltage Network Improvement at Fise – Amasaman (Ga West District)

13

Development of electricity supply at Ayikai Doblo

14

Extension of supply to parts Obeyie Phase II and Rehabilitation of LV network at Hebron

15

System Improvement at Afuaman

16

Extension of supply to parts of Oyibi Buade Phase II

17

Injection of 15no. 50kVA PMTs and 3no. 100kVA PMTs at Nmai Djor-Legon District

18

Extension of supply to Apirede – Akuapem Mampong (Phase II)

19

Expansion of LV network at Kyeakor

20

System Improvement at Akyawkrom and Achinakrom

21

LV supply improvement at Kofi Sarpong

22

Extension of supply to Asamang

23

Relocation Works at Circle Interchange

24

Relocation Works Agona Junction to Elubo Border

25

Relocation Works at Tarkwa- Bogoso-Ayanfuri

26

Construction of a 2X 10MVA 33/11kV Primary Substation at Asamankese and a 25km 2X 40MVA 33kV circuit

27

Construction of 2X60MVA Double Circuit Tower Line from Akyempim BSP to the Damang Mines

28

Construction of 33/11kV 2x10MVA Primary Substation at Offinso

29

Construction of a 33/11kV Outdoor Primary Substation at Barekese

30

Construction of 2 x 60MVA 33kV Double Circuits Line between Takoradi Substation “C” and Western Diamond Cement Factory

31 Laying of 2x3x2(1x630sq.mm) XLPE 33kV Al cables from the 33/11kV Substation 'B' at Korle-Bu to James Town
32

Construction of an 8.5cct-km Double Circuit tower line from Tokuse S/S to the Kasoa Switching Station

33

Network Extension Projects in the Central and Western Regions – CB Electric Phase I

34

Relocation Works at Eastern Corridor    

35

Relocation Works at Teshie Link Road

36

Network Extension Projects in Eastern and Volta regions – CB Electric Phase II

37

Reconductoring and reinsulation of 11kV networks in forested areas within Somanya District

38 Replacement of weak concrete/wooden poles with steel tubular poles on HV network from Winneba to Swedru, Central region
39 Replacement of wooden poles with steel tubular poles on bush fire prone sections of the 33kV Nkwanta feeder
40

Reinsulation of Benso/Bobikuma 33kV Feeder in Central Region

 

 

 

Rural Projects

Region Item No. Project Description / Title CONTRACTOR  Contract Sum Year of Completion Expected Impact/Impact
USD EUR GBP GHC
Greater Accra, Eastern & Volta Regions 1 Relocation of ECG network along the Awoshie to Pokuase Road Kurtson Company Ltd       3,276,731.07 2014 Strengthened weak and obsolete assests and paved way for road works on the newly constructed Awoshie road
Greater Accra, Eastern & Volta Regions 2 Upgrade of Cantonments 1 & 2 Feeders Kurtson Company Ltd       4,458,987.02 2014 Strengthened weak and obsolete assests and paved way for road works on the Giffard road
Across Operational Regions 3 Relocation of ECG network along the Madina to Pantang Road Rein Bee Company Ltd       2,537,469.00 2012 Removed obstructions to road works and provided alternative feeders for customers
Greater Accra 4 GEDAP- GRID EXTENSION PACKAGE FOUR (GEDAP [ACGF] C2B-4/09) China Water & Electric 8,981,065.46     18,861.34 2011 14,400 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation of HV & LV Distribution Networks under Grid Extension -Eastern, Greater Accra & Volta Regions
Greater Accra 5 GEDAP- INTENSIFICATION PACKAGE TWO (GEDAP [IDA] C1A-2/09) Shenzeng Farad 8,830,043.52     1,169,340.98 2011 20,500 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation Upgrade of 33KV, 11KV & LV Distribution Networks Under Intensification in Greater Accra, Eastern & Volta
Greater Accra 6 SHEP 4- CWE Contract Phase two China Water & Electric 170M       2014 69,500 new customers were connected to the grid for socio-economic development
Greater Accra 7 Relocation Of ECG Network in Dansoman Kurtson Company Ltd       315,324.57 2011 This paved way for road construction in Dansoman
Greater Accra 8 Relocation of Underground Cable and equipment along the Graphic Road Kurtson Company Ltd       3,405,033.82 2011 This paved way for the construction of the BRT overpass on Graphic Road resulting in free-flow of traffic
Ashanti 9 GEDAP- GRID EXTENSION PACKAGE THREE (GEDAP [ACGF] C2B-3/09) Shenzeng Farad 6,368,369.98     647,704.94 2013 8,170 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation of HV & LV Distribution Networks under Grid Extension in Ashanti Region
Ashanti 10 GEDAP- INTENSIFICATION PACKAGE THREE (GEDAP [IDA] C1A-3/09) China Water & Electric 9,859,596.82     13,464.00 2012 24,100 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation Upgrade of 33KV, 11KV & LV Distribution Networks Under Intensification – Ashanti Region
Ashanti & Eastern 11 FINLAND CREDIT (ELTEL)                                                                                                          Supply & Installation of HV & LV Networks in Eastern & Ashanti Regions ELTEL   10M     2011 6,000 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Western Region 12 GEDAP- GRID EXTENSION PACKAGE TWO (GEDAP [ACGF] C2B-2/09) China Water & Electric 16,549,517.75     14,543.23 2012 21,300 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation of HV & LV Distribution Networks under Grid Extension -Western Region
Central & Western 13 Poverty Oriented Grid Extension-SECO (Phase 1) China Water & Electric 6,600,000.00       2014 10,000 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Central & Western 14 GEDAP- INTENSIFICATION PACKAGE ONE (GEDAP C1A-1/09) China Water & Electric 4,457,671.00     55,000 2011 17,300 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation Upgrade of 33KV, 11KV & LV Distribution Networks Under Intensification – Central & Western Regions
Central & Western 15 GEDAP- GRID EXTENSION PACKAGE ONE (GEDAP [ACGF] C2B-1/09) China Water & Electric 7,976,033.51     12,617.00 2011 11,900 new households were connected to the grid resulting in increased access to electricity and translating into improved quality of life
Supply & Installation of HV & LV Distribution Networks under Grid Extension - Central Region
Volta 16 Cross Border Phase One Energy Ventures Ltd   3.6M     2010 Supply was extended to 17 Togolese Border towns with ECG earning some foreign currency in return

Special Projects

Region Item No. Project Description Contractor Contract Sum (GHC) Year of Completion Expected Impact/Impact  
 
Central Region 1 Re-insulation of Benso/Bobikuma 33kV Feeder in Swedru- Central Region Foreen Electrical Eng. Ltd 106,651.60 2016    
Accra West 2 Rehabilatation of the electricity distribution network at Agbogloshie Market Komfather Electrical Limited 40,813.25 2015

1. Reduce illegal connections in the market
2. Reduce the risk  of fire outbreak 
3. Increase revenue

 
Ashanti East 3 Reconductoring and re-insulation of 11kV Network in forested areas Ashanti East Adusi Electrical Works Limited 142,803.93 2015 Reduce losses and feeder downtime due to overgrown vegetation and cracked insulators  
Ashanti East 4 Reconductoring and re-insulation of 11kV Network in forested areas Ashanti East Komfather Electrical Limited 126,097.74 2015 Reduce losses and feeder downtime due to overgrown vegetation and cracked insulators  
Western Region 5 Reconductoring and re-insulation of 11kV Network in forested areas Sekondi and Takoradi Districts Eagle Electrical Ventures 134,380.09 2015 Reduce losses and feeder downtime due to overgrown vegetation and cracked insulators  
Eastern Region 6 Extension of supply to Achiase SHS,Achiase ICT Centre and Chips Centre  At Kokobeng Epicenter and Duakon Akim Oda Roxno Electrical Engineering Ltd 11,533.08 2014 Supply reliability and access have been improved  
Eastern Region 7 Transformer injection and Network Intensification works at Akokoaso Akim Oda District Roxno Electrical Engineering Ltd 30,546.86 2015 Reduce losses and feeder downtime to improve power supply reliability  
Ashanti Region 8 Provision of Dedicated Supply to serve 4No. SSNIT offices in the Ashanti Region Renowed Electrical Limited 71,859.77 2014 Improved power supply reliability and customer satisfaction  
Eastern Region 9 Provision of Dedicated Supply to serve 4No. SSNIT offices in the Eastern Region D.K Afoakwa Company Ltd 12,049.12 2014 Improved power supply reliability and customer satisfaction  
Eastern Region 10 Intensification of Supply to Abomosu,Kukubi and Owonomera New Abirem District Lumiere Energy Services 90,472.53 2015 Voltage profile has been improved after undersized conductors were upgraded  
Western Region 11 Provision of Dedicated Supply to serve 4No. SSNIT offices in the Western Region Darex Electricals Eng. Ltd 19,163.98 2014 Improved power supply reliability and customer satisfaction  
Western Region 12 Supply and Installation of Covered Conductors at Agona in the Western Region Mustek Engineering Ltd 1,659,736.54 2015 Reduce losses and feeder downtime due to overgrown vegetation and cracked insulator  

Subtransmission Projects

REGION Item No. Project Description / Title Contractor  Contract Sum Year of Completion Expected Impact/Impact
 USD  EUR  GBP  GH¢
GREATER ACCRA A. Bulk Supply Points (BSP's) & Primary Substations              
  Construction of a 33/11kV Substation at the ECG Training center Bentry Comp. Ltd            28,693.50            432,754.8 2016  
1 Replacement of Obsolete 33kV I/D switchgear in 6No. substations in Accra ATLANTIC Int. Holding Company Ltd           13,825,524.2       1,989,383.1 2014 Obsolete substation control equipment which were unsafe to operate were replaced to improve operational efficiency amd system capacity. It has led to the relief of overloaded networks to eneable connection to new customers within Accra metropolis.
  i. Accra Substation F     2014
  ii. Accra Substation G     2014
  iii. Accra Substation L     2014
  iv. Accra Achimota BSP      
  v. Accra Station K     2013
  vi. Accra Substation D     2014
2 Upgrading of Primary Substation ‘W’ at Akuapem Mampong.  Luton Engineering Services (SOUTHWEST) Ltd            1,624,505.9   2014 The new Substation has provided the needed capacity to provide reliable supply to new customers on the Akuapim Ridge as well as reduce system losses on overloaded networks
3 Supply and Installation of Nine (9No.) 33kV Tamco AIS at Tema Station ‘E’            737,275.3       2014 The installation of the new panels has led to improvement in operational efficiency and provided connection to new customers in and around the Tema Industrial enclave
4 Supply ONLY and supply & Installation of 33kV outdoor switchgear and equipment at Nsawam Substation            1,047,189.5   2014 There has been significant improvement in power supply reliability, loss reduction and improved operational efficiency
5 33/11kV Substations Development at Adabraka Pelfaco Ltd         3,870,992.3            399,305.0 2014 The Substation has led to significant improvement in power supply within the Business District in Accra
6 33/11kV Substations Development at LA (Trade Fair)   2014 There has been significant improvement in power supply reliability, loss reduction and improved operational efficiency within the Trade-Fair and labone environs
7 Supply and Installation of 2No Primary Substations at Darkuman and Gbawe Djaman Messrs Elsewedy Electric T&D       16,510,194.5         2,476,529.2 2014  
  i. Construction of 2X20 MVA, 33/11kV Indoor Primary S/S at Gbawe Djaman     2014 The Substation has led to significant improvement in power supply reliability, meet demand of new customers and improved operational efficiency within the Accra West District
  ii.Construction of 2X20 MVA, 33/11kVIndoor Primary S/S at Darkuman     2014 The Substation has led to significant improvement in power supply reliability, meet demand of new customers and improved operational efficiency within the Accra West District
8 Supply And Installation Of Protection "Relay" Equipment (Contract No. EECG/PGIL-34-3st-05/13D) Palmers Green Int. Ltd                191,452.0     2014 Installation of the relays at selected substations has led to the operational efficiency and improved system protection
GREATER ACCRA 9  ECG Network Extension Phase II :                                                                                                                                                                                                                                                                                                                      Construction of a 2X20MVA 33/11kV Indoor Substation at Aburi Jacobsen Elektro AS             2,763,436.0     2014 It is expected that the alternative supply to the Aburi Mampong Substations would enhance operational flexibility
10 Construction of a 2X20MVA 33/11kV Indoor Substation at Shiashie             2,763,436.0     2014 The Station has led to improvement in operational flexibility as well as strenthen the sub-transmission backbone to meet growing demand in the East Legon, Shiashie, Legon and surrounding communites
11 Supply and Installation of 4No. 20/26MVA 33/11kV Power Transformers Pelfaco Ghana Ltd/Goodluck Steel Tubes Ltd         1,406,000.0       2014 System capacity has been improved to ensure sustainability of power supply within various Districts where the transformers have been installed
  Construction of a 2x60MVA 33kV Double circuit tower line from the ECG Mobole Substation to the Appolonia City Project site Best & Crompton Ghana Ltd         2014 Supply reliability has been improved as well as meeting the demands of new residents within the Apolonia enclave
12 Supply and Installation of 33kV Indoor Double Busbar Switchgear and associated Civil Works for Accra 3BSP ATLANTIC Int. Holding Company Ltd             1,838,058.6     2013 The installations significantly improved operational efficiency
13 Supply and Installation of 33kV Indoor Double Busbar Switchgear and associated Civil Works for Accra 3BSP (Temporary works)                                                                       ATLANTIC Int. Holding Company Ltd                  77,400.0     2013 The installations significantly improved operational efficiency
14 Upgrade of SCADA control centers in TEMA and ACCRA ATLANTIC Int. Holding Company Ltd         1,770,597.8       2013 The SCADA upgrade works improved automated operations to ensure operational efficiency in our networks at Accra and Tema
15 Construction of a 2X10MVA 33/11kV substation at TTL Luton Eng. Services (SOUTHWEST) Ltd         1,483,047.1       2013 The substation improved capacity of the networks to enhance supply reliability within parts of the Tema communities
16 Supply and installation of 33kV indoor GIS panels at Accra station ‘A” Odorkor Luton Engineering Services (SOUTHWEST) Ltd         4,895,296.0       2013 The installation of the new panels has led to improvement in operational efficiency
17 Construction of a 2X20MVA 33/11kV Indoor Substation at Awudome Jacobsen Elektro AS             2,763,436.0     2013 The newly constructed substations have significantly improved power supply reliability, system loss reduction and customer satisfaction
18 Construction of a 2X20MVA 33/11kV Indoor Substation at Ministries (Lotteries) Jacobsen Elektro AS             2,763,436.0     2013
19 Construction of a 2X20MVA 33/11kV Indoor Substation at Nungua Jacobsen Elektro AS             2,763,436.0     2013
20 Supply and Installation of 11kV Indoor Tamco AIS Panels for Tema Stations A, D & E    Luton Engineering Services (SOUTHWEST) Ltd            192,632.5       2012 The installation of the new panels has led to improvement in operational efficiency
                 
GREATER ACCRA B. Double Circuit Tower Line Construction              
  Upgrade of Tema "H" to the First Dead end Tower Section of the Tema "H" Ashiaman 2X40MVA 33kV Overhead Line to 2X60MVA Best & Crompton Ghana Ltd         1,401,033.0            874,344.1 2016  
  Construction of 2X40MVA 33kV double circuit overhead lines from Dodowa to Adenta Substation   Best & Crompton Ghana Ltd              11,609.0            430,481.8 2016  
  Construction of 2X60MVA 33kV double circuit overhead lines from Nmai-Dzor to Adenta Substation   Best & Crompton Ghana Ltd            796,491.4       2015 The interconnectivity has allowed transfer of power between the Eastern bank of the Accra BSP and Tema to improve operational flexibility
  Construction of 2x60MVA 33kV Double circuit tower line from the ECG Mobole Substation to the Appolonia City Project site. Best & Crompton Ghana Ltd         2,124,117.8         1,951,874.5 2015 The growing demand within the Apolonia enclave has been met as well as improved Revenue generation
  Construction of 2x60MVA 33kV overhead circuit from Mallam BSP to New Dansoman S/S. Energy Ventures Ltd.         1,032,046.0            339,856.6 2015 It is expected that operational efficiency would be improved within the Accra West Region
21 Construction of 33kV DC tower line from Lashibie S/S to new Nungua/Teshie SS Jacobsen Elektro             1,024,319.0     2014 The interconnectivity has allowed transfer of power between both substations to improve operational flexibility and efficiency
22 Construction of 33kV Double Circuit line from Tema H to Tema Substation "A" Best & Crompton Ghana Ltd         3,233,234.2         1,432,800.6 2014 Improved system operational efficiency, technical loss reduction and customer satisfaction
23 Construction of 33kV Double Circuit line from Tema A to Tema Substation Lashibi     2014 Improved system operational efficiency and customer satisfaction
24 Construction of 33kV Double Circuit line from Tema A to Tema Substation "D"     2014 Improved system operational efficiency, technical loss reduction and customer satisfaction
25 Construction of 33kV DC tower line from Lashibie SS to new Nungua/Teshie SS     2014 Improved system operational efficiency and customer satisfaction
25 Construction of 33kV Double Circuit line from Tema "E" to Tema Substation "D"     2014
27 Construction of 2x40MVA Double Circuit Tower Lines from Nsawam to Ofankor (ECG/SS-10/6) AV Hermon Company Ltd              664,845.0 2013 The tower line has improved operational flexibility between both substatiobs to ensure reliability of power supply. Also the line improved load transfer between the Eastern and Western banks of the Achimota BSP
28 Construction of 2x40MVA Double Circuit Tower Lines from Nsawam through Aburi S/S to Akuapim Mampong Jacobsen Elektro AS             4,561,556.7     2014 The tower line has improved operational flexibility between both substatiobs to ensure reliability of power supply
29 Reinforcement Works For The Mallam To Weija Double Circuit & Weija To Tokuse Single Single Circuit Tower Lines (ECG/Reinf/AA-P-Z/11)      Fredmef Ventures Ltd.              870,925.5 2012 Improved sustainability of power supply in and around communities in the Accra West regions
30 Reinforcement and upgrade of existing 33kV double circuit tower lines in Accra.(GG2 AA4/07) Energy Ventures Limited         1,032,046.0         1,987,401.0 2012 The reinforcement works significantly improved power supply stability witihn various areas in the Accra Region
31 i.ACC Station S-C      
  ii.Mallam BSP (AA) to Weija (P) S/S (8km)      
  iii. ACC Station AA-S (3.5km)      
  iv.ACC Station L-Q (5.2km)      
  v. ACC Station AA-A (6.2km)      
  vi. ACC Station H-D (4.2km)      
  vii. ACC Station D-E (2.6km)      
GREATER ACCRA                  
C. 33/11kV OHL/Underground Circuits & Off-Loading Circuits              
  Laying of additional cable from the two (2) new GridCo transformers to the ECG 33kV Board Atlantic Int. Holding Company Ltd.              478,980.5 2016  
  The Creation of Alternative 11kV Circuits to support the Radial Dodowa 11kV Feeder Stone Electrical Works           1,189,650.1 2016 We expect to improve reliability of power supply to the Dodowa township and surrounding areas
  Laying of 2x6(1x630SQMM) XPLE 33kV Cable from the Darkuman Official Town Traffic Light to the Odorkor S/S Multi Projects Com. Ltd              489,584.2 2016  
  Provision of a radial 11kV dedicated underground circuit from the Shiashie substation to the University of Ghana Teaching Hospital (UGTH) facility, near Noguchi, Legon. Chris-Power Engineering Ltd              120,608.3 2016  
  Tower line Works on the Existing Awoshie, Weija and Kumasi “D” to “F” 2x40MVA 33KV Double Circuit Tower lines Best & Crompton Ghana Ltd              360,732.5 2016  
  Karpowership evacuation project- Conversion of 11kV Overhead Line to underground around Valco, Tema Jacob Engineering. Ltd              378,005.9 2016  
  Provision of 33kV Underground Cables to Evacuate Power from the New Sixth GRIDCo. Transformer at the Achimota BSP Foreen Engineering Services Ltd              313,998.8 2016  
  Creation of a new 11kV line from the Nsawam Substation to relieve the Nsawam-Accra 11kV kine SBINC Solutions              104,243.6 2016 We expect to relieve the overloaded Nsawam-Accra 11kV line ti improve stsability and reliability of power supply
  Provision of Power Supply to Fabrimetal Ghana Limited at Tsipoli Jacob Engineering Company               14,490.7 2016 The extension of the supply enabled the company to commence operations
  Provision of a second dedicated 33kV circuit to Sentuo Steel Ltd. In Tema & a dedicated 11kV circuit to the Tigo head office in Accra Chris-Power Engineering Ltd              154,348.2 2015  
  Separation of the Tetteh Quarshie Hospital from the Mampong Township Feeder Nyanab Ghana Ltd.               71,493.1 2015  
  Provision of Power Supply to the new Achimota Shopping Mall Katech Engineering               39,928.1 2015  
  Conversion of the 2.0km portionof the fault-prone take-off cable section of the 2x40MVA Tema Station "H" to Ashiaman 33kV to a 2x60MVA OHL Best & Crompton Ghana Ltd            328,220.5             18,646.2 2015  
  Creation of offloading circuits from the Adabraka primary substation in Accra Chris-Power Engineering Ltd              329,894.8 2015  
  Provission of Optical Fiber Cables connectivity between Stations "H" and "M" to the Legon District Office Best & Crompton Ghana Ltd              70,766.1            150,001.7 2015 We expect to improve operational efficiency and enhance communication within the Accra network
  Laying of 2x3(1x630sq.mm) XLPE 33kV Al cable from James Town to 33/11kV substation 'G' and 33/11kV ministry substation Multi Projects Ltd              306,020.5 2015 To enable transfer of power between Mallam BSP and Achimota BSP and provide reliable supply to the Central Business District of Accra
  Laying of 2x6(1x630SQMM) XPLE 33kV Cable from the Proposed Darkuman Substation to Darkuman Official Town Traffic Light Multi Projects Ltd              371,229.6 2015 The inerconnection circuit is to relieve overloaded circuits from the Odorkor Primary Substation
  Relocation of a portion of Glefe OHL Feeder to paveway for safe clearances to the 2X60MVA Dansoman to Mallam tower line. Stone Electrical Works              205,634.6 2015 The relocation works enabled the Mallam to Dansoman Double Circuit Tower to be constructed
  Creation of 11kV off-loading circuits from the Darkuman Primary Substation Elsewedy Electric T&D              280,688.4 2015 We expect to improve supply reliability within the Darkuman, Odorkor and Kwashieman areas
  Construction of two separate 11kV underground circuits from the Tokuse substation to the proposed West Hills Shopping Mall project at Bortianor Stone Electrical Works               99,555.7 2015 It is expected that reliability of power supply to the Mall would be greatly improved to enable the Mall operate efficiently.
  Laying of 1x630sqmm cable from Awudome S/S to Darkuman S/S. (ECG/SS/DA-AW/01/14) Investrade International Com. Ltd              487,141.5 2015 The intercoonection to the Darkuman Substation has improved operational flexibility within parts of the Accra West Region
  Construction of two (2) dedicated 11KV circuits from the OSU and Ridge Substations for the National Primary Data Center, Ridge Modes Power Ltd            183,820.0       2015 The project has improved the supply reliability to the premises of the National Primary Data Center
  Creation of additional 11kV feeder from the Osu Substation to support the heavily loaded G13-R12 11kV Interconnected circuits at the Acacia Court Substation (G13/10/01). Modes Power Ltd              61,727.8       2015 The project has relieved overloaded feeders from the Osu and Ridge Substations to improve capacity to meet load requirements of customers in the Osu enclave
  Extension of Electricity Supply from the Old Works Substation to the New Kpong Water Treatment Plant Stone Electrical Works                 2,811.5 2015 The Project has improved the reliability of power supply to the New Kpong Water Treatment Plant
  Conversion of the existing 2 No. 3x185 sq. mm XPLE (11kV) UG cable from substation "L" to Burma Camp to an Overhead Line network Ikejas Engineering Ltd